Recently, the reporter learned from Zunyi Comprehensive Bonded Zone that the construction of the new energy industry cluster in Xinpu New District, Zunyi City has entered the "fast lane" - the annual production of 300000 new energy electric vehicles has entered the trial operation stage, and the production line and supporting projects of biochar based solid-state batteries are also being constructed in an orderly manner.

It is reported that the annual production of 300000 new energy electric vehicles is led by Xinhang (Guizhou) New Energy Vehicle Co., Ltd. It was officially launched in April this year, with an estimated annual output value of 1 billion yuan within 3 years, and will achieve the ability to produce 300000 new energy vehicles annually. At that time, it will not only drive the development of upstream and downstream supporting industries, but also create more job opportunities for the new area. It is reported that the first phase of the project will lease a 15000 square meter factory building and simultaneously plan to lay out vehicle trade in and scrap recycling businesses on 20 acres of land, focusing on creating an integrated new energy industrial park of "production+operation+recycling".
At present, the construction of four intelligent production lines, namely welding, stamping, painting, and final assembly, is progressing in an orderly manner, and in the future, a full industry chain production system for electric vehicles will be formed. Zhang Jing, Deputy General Manager of Xinhang (Guizhou) New Energy Vehicle Co., Ltd., introduced that the project will rely on the advantages of Zunyi Comprehensive Bonded Zone to do a good job in export business to the Southeast Asian market and vigorously expand the international market.
In addition, the production base project of Zunyi Navi Intelligent Manufacturing Co., Ltd.'s biochar based solid-state battery is also in a tense and orderly construction stage. The total investment of this project is about 3 billion yuan, covering an area of 232 acres with a total construction area of 95000 square meters. The core construction content includes an AILB bio carbon based solid-state battery production line and a secondary data center dedicated uninterruptible power supply comprehensive system production line, with a construction period of about 18 months.
According to the project leader, the basic engineering construction is currently being promoted, and it is expected to be completed by the end of the year, including the construction of the office building. It will officially start production in October 2026, with an expected annual output value of over 4 billion yuan and tax revenue of over 300 million yuan, which can drive employment for more than 200 people.



在线客服